pk10前五技巧定位胆

Chengdu-Guizhou High Speed Rail Baiyun North Station opened for operation on December 30

来源:贵阳网—贵阳日报 Release time: 2019-12-30 09:58 Source: Guiyang Network-Guiyang Daily

Beginning at 00:00 on December 30, the national railway will implement the end-of-year operation plan. The Chengdu-Guizhou high-speed railway Baiyun North Station will be officially opened and included in the scope of electronic tickets. And trial electronic ticket.

Baiyun North Station is located in Baiyun District, Guiyang City, under the jurisdiction of Guiyang Railway Station, and is one of the intermediate stations of Chengdu-Guizhou high-speed railway. At the peak of passenger flow, the maximum number of people gathered at the station was 400.

After the opening of Baiyun North Station, the mileage from Baiyun North to Guiyang North was 12 kilometers, which lasted 11 minutes; the mileage from Baiyun North to Bijie was 142 kilometers, the fastest time was 44 minutes; the mileage from Baiyun North to Chengdu East was 638 kilometers, which lasted 3 hours 39 minute.

In the initial stage of the opening of Baiyun North Station (December 30, 2020 to January 8, 2020), there were five round trips of the "C" intercity high-speed EMU. Among them, 3 stops from Guiyang North to Bijie and Chengdu, respectively C5950 times (Guiyang North-Bijie), C5952 times (Guiyang North-Bijie), C5984 times (Guiyang North-Chengdu East); 2 returns , C5953 times (Bijie-Guiyang North), C5971 times (Chengdu East-Guiyang North).

From January 9, 2020, the number of "C" intercity high-speed EMUs that stop at and from Baiyun North Station will be reduced to 4 trips, respectively C5950 (Guiyang North-Bijie) and C5952 (Guiyang North-Bijie). ), C5953 times (Bijie-Guiyang North), C5971 times (Chengdu East-Guiyang North). (Zeng Qin, Guiyang Daily News Media Platform)

Editor-in-chief: Li Huaying

Essential Atlas
Video recommendation